[New post] Likoni floating bridge set to be opened this month
Magari Poa posted: " The Sh1.7 billion bridge, expected to be opened to the public in mid-month, will be 800 metres long and will have a six-metre wide walkway. The bridge will have a 150-metre long movable part, right at the middle, which will be opened and closed"
|
posted by Blogger @ 3:30 AM
0 Comments

0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home